adhyntra.com > Projects > Pharma Block Consultancy & Facility Setup
Pharma Consultancy

Pharma Block Consultancy & Facility Setup

PROJECT DESCRIPTION

A pharmaceutical manufacturer in Dehradun required end-to-end consultancy and engineering support for setting up a new production block, cleanroom facility, oncology block, and utility building.
The project involved converting a raw area into a fully functional, regulatory-compliant pharma block capable of supporting oncology formulation and general pharma operations.

The client assigned Adhyntra Pvt Ltd to deliver a complete solution — including GMP layout design, HVAC & cleanroom engineering, piping design, utility planning, equipment integration, and on-site execution support.

This was a complete turnkey consultancy project, from concept to validation readiness.

PROJECT PROCESS / APPROACH

1️⃣ Requirement Study & Concept Design

  • Detailed study of process flow, equipment list & production capacity
  • Evaluation of oncology-specific containment requirements
  • Identification of cleanroom grades & pressure zones
  • Space planning for production, packaging, QA/QC & utilities
  • Safety & compliance review (US-FDA / WHO / Schedule M)

2️⃣ GMP Layout Development

Designed complete layouts for:

  • Production block
  • Oncology block (high containment, segregated movement)
  • Cleanroom areas (ISO Class 7/8)
  • Dispensing, granulation & blending zones
  • Primary & secondary packaging
  • Material & personnel flows with correct airlocks
  • Utility building: AHU area, boiler, chiller, compressor, scrubber

Key GMP elements:

  • Unidirectional flow planning
  • Cross-contamination control
  • Pressure cascade hierarchy
  • Hygienic zoning & airlocks
  • Material storage strategy

3️⃣ HVAC & Cleanroom Engineering

  • AHU capacity calculation & selection
  • HEPA-based filtration system design
  • Room pressure mapping for oncology + general areas
  • Duct routing, airflow balancing & fresh air load design
  • Temperature & RH control strategy
  • Cleanroom paneling specifications
  • Air change rate calculation

Delivered:

  • HVAC layouts
  • Ducting drawings
  • AHU placement/design
  • Cleanroom zoning plan

4️⃣ Utility Engineering & Piping Design

Generated complete P&IDs and routing for:

  • Purified water system
  • Hot & chilled water
  • Compressed air & vacuum
  • Steam & condensate
  • Scrubber/Exhaust system
  • Chemical handling lines (if required for oncology)

Piping Deliverables:

  • Isometrics
  • Utility routing
  • Support & hanger layout
  • Bill of materials

5️⃣ Equipment Planning & Installation Support

  • Equipment GA drawings
  • Nozzle orientation & foundation planning
  • Equipment movement path planning
  • Tie-in points for all utilities
  • Material of construction selection for oncology

Supervision & coordination with:

  • Electrical
  • HVAC
  • Piping teams

6️⃣ Documentation & Validation Preparation

  • URS / DDS preparation
  • Quality & engineering documentation
  • HVAC qualification protocols
  • Room readiness & environmental validation support
  • As-built drawings
chemical_research_02

WORK SCOPE 

  • ✔ Production block design (GMP compliant)
  • ✔ Cleanroom & oncology facility layout
  • ✔ Utility building design
  • ✔ HVAC & Cleanroom Engineering
  • ✔ Complete utility P&IDs
  • ✔ Piping layout & isometrics
  • ✔ Cross-contamination & containment strategy
  • ✔ Equipment layout & installation support
  • ✔ Documentation (URS/DDS/IQ/OQ support)
  • ✔ On-site coordination & execution guidance