OIL & PETROLEUM PLANT PROJECT
⭐ PROJECT DESCRIPTION
Indian Oil Corporation Ltd. (IOCL) required the fabrication, welding, installation, and testing of process pipelines inside their oil & gas handling facility.
The work demanded strict adherence to oil & gas industry standards, including high-pressure safety requirements, material traceability, quality documentation, and compliance with IOCL’s approved welding procedures.
Adhyntra Pvt. Ltd. executed the project with high precision, ensuring zero safety incidents, 100% compliance, and flawless quality under tight operational timelines.
⭐ PROJECT PROCESS / APPROACH
1️⃣ Technical Review & Scope Understanding
- Reviewed IOCL-issued P&IDs, isometrics & line specifications
- Studied project quality plan (PQP), WPS, PQR & welder qualification records
- Assessed site conditions, tie-in points & safety restrictions
- Planned manpower & welding sequence based on criticality
2️⃣ Material Preparation & Traceability
- Material verification as per IOCL specifications (MTC review)
- Heat number, batch number & identification marking
- Pre-fabrication inspection of pipes, fittings & flanges
- Maintaining material traceability up to final weld
3️⃣ Piping Fabrication & Welding Execution
Performed all activities as per ASME, API, and IOCL QAP standards, including:
- Pipe cutting, beveling & fit-up
- SMAW/GTAW/GMAW welding as per WPS
- Pre-heating & interpass temperature control
- Adherence to welding consumable control (dry oven, storage)
- Joint numbering & weld mapping
Welding performed on:
- CS / SS / Alloy steel pipelines
- High-pressure utility & product lines
- Interconnecting pipelines & tie-in joints
4️⃣ Installation & Alignment
- Alignment & leveling of pipe spools
- Supports, anchors, guides & spring hanger installation
- Bolt torqueing as per tightening sequence
- Connection to existing live pipelines following strict safety protocols
5️⃣ NDT, Hydrotest & Quality Control
- 100% visual inspection
- Radiography / Ultrasonic Testing as per IOCL QAP
- DP/MP testing for weld surface defects
- Hydrotest / Pneumatic test based on specification
- Pressure gauge calibration & test pack creation
- Final inspection & clearance by IOCL QA/QC team
6️⃣ Safety & Compliance
Executed under strict oil & gas safety rules:
- Permit-to-work system
- Hot work safety
- Gas testing
- Fire watch deployment
- PPE & flameproof tools
- Work under supervision of IOCL safety officer

⭐ WORK SCOPE
- ✔ High‐pressure pipeline welding & fabrication
- ✔ Spool fabrication as per WPS/PQR
- ✔ Tie-in welding in live plant conditions
- ✔ NDT (RT/UT/DP/MP) coordination
- ✔ Hydrotesting & documentation
- ✔ As-built marking & handover