OIL & PETROLEUM PLANT PROJECT

PROJECT DESCRIPTION

Indian Oil Corporation Ltd. (IOCL) required the fabrication, welding, installation, and testing of process pipelines inside their oil & gas handling facility.
The work demanded strict adherence to oil & gas industry standards, including high-pressure safety requirements, material traceability, quality documentation, and compliance with IOCL’s approved welding procedures.

Adhyntra Pvt. Ltd. executed the project with high precision, ensuring zero safety incidents, 100% compliance, and flawless quality under tight operational timelines.

PROJECT PROCESS / APPROACH

1️⃣ Technical Review & Scope Understanding

  • Reviewed IOCL-issued P&IDs, isometrics & line specifications
  • Studied project quality plan (PQP), WPS, PQR & welder qualification records
  • Assessed site conditions, tie-in points & safety restrictions
  • Planned manpower & welding sequence based on criticality

2️⃣ Material Preparation & Traceability

  • Material verification as per IOCL specifications (MTC review)
  • Heat number, batch number & identification marking
  • Pre-fabrication inspection of pipes, fittings & flanges
  • Maintaining material traceability up to final weld

3️⃣ Piping Fabrication & Welding Execution

Performed all activities as per ASME, API, and IOCL QAP standards, including:

  • Pipe cutting, beveling & fit-up
  • SMAW/GTAW/GMAW welding as per WPS
  • Pre-heating & interpass temperature control
  • Adherence to welding consumable control (dry oven, storage)
  • Joint numbering & weld mapping

Welding performed on:

  • CS / SS / Alloy steel pipelines
  • High-pressure utility & product lines
  • Interconnecting pipelines & tie-in joints

4️⃣ Installation & Alignment

  • Alignment & leveling of pipe spools
  • Supports, anchors, guides & spring hanger installation
  • Bolt torqueing as per tightening sequence
  • Connection to existing live pipelines following strict safety protocols

5️⃣ NDT, Hydrotest & Quality Control

  • 100% visual inspection
  • Radiography / Ultrasonic Testing as per IOCL QAP
  • DP/MP testing for weld surface defects
  • Hydrotest / Pneumatic test based on specification
  • Pressure gauge calibration & test pack creation
  • Final inspection & clearance by IOCL QA/QC team

6️⃣ Safety & Compliance

Executed under strict oil & gas safety rules:

  • Permit-to-work system
  • Hot work safety
  • Gas testing
  • Fire watch deployment
  • PPE & flameproof tools
  • Work under supervision of IOCL safety officer
matirial_engineering_03

WORK SCOPE

  • ✔ High‐pressure pipeline welding & fabrication
  • ✔ Spool fabrication as per WPS/PQR
  • ✔ Tie-in welding in live plant conditions
  • ✔ NDT (RT/UT/DP/MP) coordination
  • ✔ Hydrotesting & documentation
  • ✔ As-built marking & handover