PROJECT DESCRIPTION

A leading liquor manufacturing plant required eight vertical above-ground storage tanks ranging from 300 KL to 500 KL, designed as per API 650 standards for safe storage of alcohol and process liquids.
The scope also included designing a complete transfer and distribution pipeline network, pump sizing, and a multi-point loading/unloading system to ensure efficient material movement across production, storage, and dispatch areas.

Adhyntra Pvt Ltd provided end-to-end engineering, covering tank design, foundation details, MOC selection, piping network, pump calculations, safety accessories, and operational integration.

PROJECT PROCESS / APPROACH

1️⃣ Requirement Study & Process Analysis

  • Assessed storage capacity requirements for different products
  • Reviewed alcohol storage norms, venting, fire safety, and ATEX/flammable zone considerations
  • Understood loading/unloading sequence and transfer frequency
  • Identified operational interlocks & safety devices

2️⃣ API 650 Tank Design – Engineering

Prepared complete design & engineering for 8 vertical storage tanks:

  • Capacity: 300 KL to 500 KL
  • Above-ground vertical cylindrical tanks
  • MOC: MS/SS as per alcohol compatibility
  • Roof design: cone/flat roof depending on tank
  • Foundation design (RCC ring wall)
  • Nozzle orientation & manhole design
  • Vent, flame arrestor, level gauge, sampling, drain
  • Wind and seismic load calculations
  • Shell plate thickness calculation as per API 650

Deliverables included:

  • GA drawings
  • Detailed fabrication drawings
  • Nozzle schedules
  • Bill of materials

3️⃣ Distribution & Transfer Network Design

Designed the complete transfer pipeline network, including:

🔹 Main storage header

  • Pipe sizing based on flow rate & friction
  • Material selection according to alcohol compatibility

🔹 Branch lines to filling, processing & unloading areas

  • Multi-directional routing
  • Optimized for minimum pressure drop

🔹 Pump selection & capacity design

  • Flow rate calculation for loading/unloading
  • TDH calculation considering elevation, friction, and distance
  • Recommended pump types (monoblock, centrifugal, AODD if needed)
  • Standby pump arrangement

🔹 Multiple Operation Modes

  • Tank-to-tank transfer
  • Tank-to-processing block
  • Tank-to-loading bay
  • Raw material unloading to tank farm

4️⃣ Safety & Compliance Integration

  • Flame arrestors on vents
  • Earthing & bonding points
  • Safety valves and overflow lines
  • Pipe color coding & marking
  • ATEX/Flameproof motor selection
  • Bund wall design recommendation for spill containment

5️⃣ Execution & Supervision Support

  • Coordination with civil and fabrication teams
  • Review of welding, fabrication & erection quality
  • Verification of slopes, supports & testing
  • Hydrotest & pneumatic test guidance
Oil_tank

WORK SCOPE (Detailed List)

  • ✔ API 650 Storage Tank Design (300–500 KL)
  • ✔ GA, Shell, Roof & Nozzle Orientation Drawings
  • ✔ RCC Foundation & Civil Load Guidelines
  • ✔ Tank Farm Layout & Safety Engineering
  • ✔ Pipeline Design – Main & Secondary Headers
  • ✔ Pump Capacity & TDH Calculation
  • ✔ Multi-Point Loading/Unloading System Design
  • ✔ Spill Containment & Safety Integration
  • ✔ Fabrication/Installation Supervision

Leave a Reply

Your email address will not be published. Required fields are marked *

If You Need Any Industrial Solution ... We Are Available For You

Chat Icon